Draglines and their limitations
in the Zaamar Goldfield of Mongolia.

Gerrit Bazuin1 & Robin Grayson2
(1) General Director of Ochir Leasing Co. Ltd.
(2) General Director of Eco-Minex International Co. Ltd.

"A Walking Dragline is not so cheap, for its overburden mounds are supposed to be later lowered and smoothed, more than doubling the costs due to double handling."

ABSTRACT

Walking Draglines are profitable and popular in Mongolia as the preferred means of cheap large-scale removal of overburden from gold placers. In the Zaamar Goldfield they are used to prepare the dredge paths of 4 large Bucket-Line Dredges, 2 owned by Shijiir Alt Ltd, 1 by Altan Dornod Mongol and 1 being assembled by Monpolymet Ltd. Nearby, Walking Draglines strip the overburden in the Hailaast Valley as part of  large-scale dry mining by Hailaast JSC of the alluvial Hailaast Placer. Intermittently, Shijiir Alt Ltd redeploys its Draglines from dredge-support duties to strip overburden for occasional dry mining of the alluvial Tuul Placer (Quaternary) and the clayey red Ulaan Placer (Neogene). Elsewhere, Walking  Draglines were formerly used in the Bugant Goldfield in pre-stripping overburden in advance of Bucket-Line Dredges, and are  used in the Shariin Gol Goldfield for stripping overburden in dry placer mining.

The popularity of Walking Draglines is in their speed, ruggedness, long reach, low operating cost, straightforward soviet technology, affordable spare parts, proven track record, and elimination of numerous trucks, excavators or bulldozers. A typical example is an Esh 70/11 model with a bucket capacity of 11m3, a boom length of 70m and a stripping rate of 400m3 per hour, power rated at 550kW from the national electrical grid. The cost new is around $2m.

The Walking Draglines usually stop mining in mid December due to intense cold and resume mining in mid April. Operating 20 hours per day for 30 days per month, an Esh 70/11 Walking Dragline is capable of stripping up to 240,000m3 a month, giving an annual output of 1,920,000m3 for the 'Dragline season'. That is impressive, and costs (capital + operating) should be well below 20 cents per m3.

However, the Walking Draglines have major shortcomings that are now becoming critical:

Firstly, Walking Draglines are not designed to excavate under water so stripping overburden below the water-table is a major problem. The Walking Draglines are not able to strip below the level of the Tuul River, but it is beneath the floodplain where the much of the huge Tuul Placer occurs. The remedy resorted to is to strip the overburden down to the river level and then for a Bucket-Line Dredge to dredge out not only the Tuul Placer but also the wet portion of the overburden. The penalty fis that as the Bucket-Line Dredges have integral On-Board Wash Plants, all material has to be dredged, including every m3 of dredged overburden. This is a mild irritant when the top of the Tuul Placer is shallow, but in some areas the top is many metres below the water table and then the annual gold output will fall sharply if a Bucket-Line Dredge is dredging and washing overburden for much of its operating hours. 

Secondly, a Walking Dragline is not so cheap for its overburden mounds are supposed to be later lowered and smoothed, more than doubling the costs due to 'double handling'. A major concern to environmentalists, regulators and the local community is the reluctance of mine owners to undertake this expensive work promptly, if ever. In the semi-arid sharply continental climate of Zaamar, the steep-faced conical and linear dragline mounds are too dry and steep to vegetate and a visual barrier of trees is not possible.

Thirdly, Walking Draglines often strip along with the overburden rich pockets of gold pay-gravel, and in some areas draglines have stripped away an entire upper gold pay zone to lay bare the target lower gold pay zone, according to research by Eco-Minex. This makes good economic sense for the Dragline user, but can leave behind dragline mounds that are capable of being profitably re-mined for gold in some instances.

DOWNLOAD ABSTRACT

GO TO NEXT ABSTRACT
 

AT THE END OF A DREDGE POND...
A Dragline above a pond it has stripped for the North Dredge of Shijjir Alt. The high water level prevents any further stripping.

SWIVELING FAST...
Draglines of this type can turn very fast even with a full bucket of material.

DRAGLINE TURNING ON ITS 'PERCH'... 
One of the Draglines stripping overburden ahead of the South Dredge of Shijiir Alt Ltd. The Dragline has cleared around itself and is now on a 'perch'.

GREY SPOIL, RED CLAY... 
Dragline of the North Dredge of Shijiir Alt, hidden behind a mound of stripped overburden and red Ulaan Placer.
DRAGLINE ON THE TOSON ALLUVIALS...
Monpolymet's Dragline preparing the dredge pond for the start-up of dredging of the Tuul Placer beneath the Toson Alluvials.
Walking Draglines are not the only option for large-scale overburden stripping. Instead, some deep dry open-pit placer mines in the Zaamar Goldfield have large excavators loading a fleet of 'merry go round' dumper trucks taking overburden to large spoil mounds later smoothed by large bulldozers to produce acceptable landforms. For instance: Altan Dornod Mongol Ltd's new mine in the Ulaan Placer;  Bayangol JSC's new mine in a splay of the Tuul Placer under the West Terrace; and Erel Ltd's former mine in the Erdes Terrace Placers.

For this type of operation, operating and capital costs are generally higher than for draglines. However, some of the deep dry pits are now so deep that normal Walking Draglines could not be used, and often the desired trucking distance greatly exceeds the reach of the Draglines.

Other alternatives to Walking Draglines have not been introduced at Zaamar. The alternative of long conveyor systems would be much cheaper, more flexible and more reliable than truck fleets. The alternative of Cutter-Suction Dredges is attractive and is presented elsewhere in this issue
(CLICK TO VIEW).

Copyright © 2000-2010
ECO-MINEX INTERNATIONAL LTD  
Last modified: January 02, 2011

The Gold Miners Book

 CLICK TO EMAIL US
 VIEW  OUR TERMS & CONDITIONS
CLICK TO SUBMIT AN ARTICLE